Alcoa Power Station - Anglea
Location: Alcoa Power Station - Anglea

Date: 1995

Project: Outside View of Coal Bunker. Cook Construction place the clay, Longreach equipment used to shape the clay. Inside View - Komatsu PC 220-5

Location: Alcoa Power Station - Anglesea

Date: 1995

Project: Outside View of Coal Bunker. Cook Construction place the clay, Longreach equipment used to shape the clay. - Komatsu PC 220-5

Alcoa Power Station - Anglesea
Macklesfield, Dandenong Ranges - Construct a private dam – Komatsu PC 220 -5 Location: Macklesfield, Dandenong Ranges

Date: 1997

Project: Construct a private dam – Komatsu PC 220 -5

Location: Moorobool River Diversion at Geelong

Date: 1992

Project: Filled gabiem baskets with rock to prevent erosion of riverbank during flood season. This part of the river was man made diversion. The rock filled gabiem baskets were covered with netting, layered with soil and sown down with grass. The roots of the grass would later bind the reinforcement together - Komatsu PC 220-5

Moorobool River Diversion at Geelong
Seaford, Victoria - De-silt the drain Location: Seaford, Vic

Date: 1992

Project: De-silt the drain (name TBA) - Komatsu PC 220-5

Location: Old Gas Works site at Melbourne Docklands

Date: 1999

Project: Remediation of the Old Gas Works Site. Site contained contaminants such as tar, cionide, emolium, phenyle and more. These were present in the soil at the site. Method of disposal when gas works were in operation was to bury the by product of burnt coal used to produce gas - Hyundai 290-3

OLd Gas Works site at Melbourne Docklands
Garfield Berry Farm
Location: Garfield Berry Farm

Date: 1998

Project: To enlarge existing irrigation dam – Hyundai 290-3

Location: Albert Park Lake

Date: 1993

Project: Clean all mud and silt from the Lake. This was placed in pre-dug holes,
covered with GO fabric and then covered with earth. Returned back to hockey fields, cricket pitches & tennis courts-Komatsu PC 220-5.

Albert Park Lake
Wallaby Creek Reservoir at King National Park

Location: Wallaby Creek Reservoir at King Lake National Park

Date: 1998

Project: To De-Silt the Reservoir. Level of difficulty 3/10. Carry out work without causing damage to historical attributes of the Reservoir which was originally built in the late 1800s - Hyundai 290-3

Location: Boort, Vic

Date: 1993

Project: Irrigation channel de-silting Mawarra Main Canal– Komatsu PC 220-5

Boort, Vic
Warragul, Victoria
Location: Warragul, Vic

Date: 1996

Project: Komatsu PC 220 – 5. After leaving Peter Carr workshop – just had
extensive repairs.– Komatsu PC 220-5

Location: Campbellfield, Vic

Date: 1992

Project: Leaving Kom yard at Campbellfield after having maintenance work done - Komatsu PC 220-5

Campbellfield, Victoria
Narracan Falls, Narracan
Location: Narracan Falls, Narracan

Date: 1997

Project: On semi roadside to de-silt reservoir at Narracan Falls, Narracan - Hyundai 290-3

"If you can't reach it, call LongReach"